Thursday, January 26, 2012

Chassis testing

Chassis testing

I hate diesels. With a chuff-chuff, you get to build the chassis and then spend many hours tweaking the thing to make it work properly. Not with the Class 25. I plopped it on the track and it ran around the layout perfectly first time. Where is the fun in that ?

I'm joking of course. Before the Leamington show opened, I took the opportunity to stick the chassis on the track and give it a go. It really did run around perfectly. The only problems were when the wires caught on the tunnel mouth exiting the fiddle yard or around the water crane. Putting the body on brought these under control and sorted this out. Those wires are too long anyway but just twisted together for testing. I'll probably use a chocolate block connector on the finished model so the thing can be easily dismantled.

The BullAnt bogies worked a treat. Even my slightly rough and ready regauging was OK. They didn't rumble over the pointwork or get upset about the curves. Even with one wire disconnected and reducing the pickup numbers, we didn't see any stalling either.

All in all, a very pleasing moment. The hobby can be relaxing after all !

1 comment:

Iain Robinson said...

This has a rather wonderful "Colonel Stephens" look about it, left as it is!